{"id":3,"date":"2019-12-20T11:39:38","date_gmt":"2019-12-20T20:39:38","guid":{"rendered":"https:\/\/multisite.crweng.com\/32nd-33rd-upgrades\/home\/"},"modified":"2025-02-02T10:26:36","modified_gmt":"2025-02-02T19:26:36","slug":"home","status":"publish","type":"page","link":"https:\/\/tashadrivereconstruction.com\/","title":{"rendered":"Tasha Drive Reconstruction Project"},"content":{"rendered":"\n
The Municipality of Anchorage (MOA) is planning to reconstruct Tasha Drive (from Flamingo Drive to Northwood Street) to meet current MOA design criteria for a local roadway.<\/p>\n\n\n\n
<\/p>\n\n\n\n
Improvements will include:<\/p>\n\n\n\n
The MOA has contracted with CRW Engineering Group, Inc. (CRW) to provide engineering services. The project is funded through the design phase using local road bonds. Construction has not yet been funded.<\/p>\n\n\n\n
Project Update:<\/strong><\/p>\n\n\n\n How to get involved:<\/strong><\/p>\n\n\n\n\n
\n
Go to this page<\/a> to see current agendas.<\/li>\n\n\n\n