Skip to content
  • Home
  • Documents & Resources
  • Comment

Documents & Resources

September 2025
Pre-Final (95%) Plans –
Sidewalk shown in 95% plans has been eliminated

December 2022
Design Study Memorandum
Report with Appendices

Sign up for the Tasha Drive Reconstruction Project Mailing List!

© 2025 CRW Engineering Group, Inc.